Daystar KJ71042BK User Manual Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 6
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
3
Tools Needed
Quantity Description
1 Masking tape (low adhesive painters tape)
1 Drill Motor
1 3/16” Drill Bit
1 1 1/4” Hole Saw (for cutting metal)
1 Phillips Head Screw Driver
1 Center punch
1 Hammer
1 Scissors
Part List
Bill of Materials
Quantity Part Number Description
1 M56087 - BK Right Hood Scoop
1 M56095 - BK Left Hood Scoop
2 M21128 - BK Bolt Wedge
4 M4-0.7 x 10mm 3/16” Phillips screw
4 M4-0.7 x 25mm 1” Phillips screw
8 M4
Flat Washer
6 1-1/4”
Rubber Grommet
4
!Warning: Always work with appropriate personal safety
gear including safety glasses, gloves and hearing protection if
using air powered tools.
Begin by inspecting the components & hardware for dam-
age. Then compare components & hardware to the bill of materi-
als for completeness. If anything is missing/damaged, do not pro-
ceed with the installation. Please, call Daystar Products (800-595-
7659) and we will send you the missing of damaged components
free of charge.
Installation Instructions
1. Clean the install area of the hood, so that all debris that can effect the instal-
lation are removed.
2. Disconnect the positive battery cable.
Notice: To ensure the cable does not make contact with the battery terminal,
securely wrap the cable end with a rag.
3. Using the scissors, carefully cut out the template.
Notice: Special care should be taken with the bottom and rear edges, they
will act as the alignment guides in a later step.
4. Starting with the passenger side of the Jeep, place the template on the hood
of the Jeep. Take care to ensure the bottom and rear portions of the template
line up with the back and bottom of the hood. This step is a crucial part of a
perfect install.
Page view 1
1 2 3 4 5 6

Comments to this Manuals

No comments